Advanced Double-End Deburring and Chamfering Machine for Metal Precision

Product Details
Customization: Available
Production Scores: Single Variety
Production Continuity: Continuous
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Customization from Samples
The supplier provides sample based customization services
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (19)
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
  • Advanced Double-End Deburring and Chamfering Machine for Metal Precision
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • FAQ
Overview

Basic Info.

Model NO.
VSJ120W-R6S
Condition
New
Automation
Automatic
After-sales Service
Overseas Service Center Available
Duration of Use
Six to Seven Years
Equipment Configuration
High Quality
Plified Operation
Simple and Convenient
Technical Certification
Independent Research and Development Design
Environmental Protection
Save Energy Consumption and Reduce Environmental P
Use Effect
Machinery Manufactured According to The Needs of C
Transport Package
Steamship
Specification
4450*2650*1500
Trademark
Vantrn
Origin
China
Production Capacity
1000p/Year

Packaging & Delivery

Package Size
320.00cm * 240.00cm * 280.00cm
Package Gross Weight
3000.000kg

Product Description

Product Description

1.The device consists of two deburring and chamfering modules. The two module bases are installed on parallel double rails, the left module is a fixed module, and the right module can move freely in a certain range to adjust the spacing and adapt to the processing of different lengths of products.
2.Each module is installed with a 3-station grinding mechanism, while grinding the cutting surface at both ends of the workpiece, removing the boss burr and rounding the corners.
3.The first station is the sand belt grinding mechanism, the sand belt is a polygonal ring high-speed operation, friction cutting workpiece convex burrs, so that the workpiece section is smooth. The grinding surface of the sanding belt is in flexible contact with the burr surface of the workpiece boss, which makes the sanding belt more durable and grinds the workpiece section more evenly. Sand belt wheel with automatic tensioning mechanism, easy to change quickly.
4.The second and third stations are the sand silk fiber mechanism, with a single sand silk fiber spinning at high speed and rotating quickly. The front and rear sand-silk fiber speed direction is opposite, and the workpiece section is swept without dead Angle in all directions. Sand silk fiber is a flexible filament-like material, which can go deep into the groove holes to remove stubborn burrs and round the inner and outer edges.
5. Each group of grinding head is equipped with an independent electronic control system, which can be run separately or combined according to demand; Servo motor control automatic feed precisely fine-tune positioning workpiece length, automatic compensation for consumables loss.
6. According to the different process requirements of the workpiece deburring, replace the sand belt or sand silk fiber material with different mesh numbers to achieve different R angles and rough process effects.
7. The grinding head is semi-closed structure, and the dust brush is installed at the material guide port to reduce dust diffusion. Equipped with special metal sanding machine vacuum cleaner, high-power environmental protection cabinet type pulse structure, collect grinding dust, reduce environmental pollution; Filter bag for long-term durable, save the cost of use, equipped with drawer dust box dust for quick cleaning dust.

Detailed Photos

Advanced Double-End Deburring and Chamfering Machine for Metal Precision
Advanced Double-End Deburring and Chamfering Machine for Metal Precision
Advanced Double-End Deburring and Chamfering Machine for Metal Precision

Product Parameters

Processing length: 500-2100mm Processing width: 20-60mm
Transmission speed: 0-5/min (variable frequency) Total power: 18.5KW (including suction)
Specifications: w4.45m*L2.65*1.5m Control system: PLC programming, man-machine interface

Advanced Double-End Deburring and Chamfering Machine for Metal PrecisionAdvanced Double-End Deburring and Chamfering Machine for Metal PrecisionAdvanced Double-End Deburring and Chamfering Machine for Metal Precision

FAQ

Q:How to remove product burrs?
A:The equipment consists of two groups of planetary brush disk combined structure; A single brush disc high-speed autobiography, the whole combination of rapid rotation, the front and back two groups of brush disc combination running in the opposite direction, through sweeping, grinding, filing and other actions, all-round no dead Angle to the workpiece edge, holes, grooves burrs

Q:What is the price of the equipment?
A:According to customer product process needs, machine configuration depends,High equipment configuration, preferential prices, much cheaper than Europe and the United States

Q:What are the features of the equipment?
A:The company independent research and development manufacturing, with complete independent intellectual property rights; The equipment is convenient to operate, simple to maintain, energy saving and environmental protection, stable and durable, and the processing product efficiency is high and the quality is good, and the equipment is upgraded for the metal parts polishing industry.
 

Q:What is the delivery date of the goods?
A:The delivery time of our products in the peak season is 60 days, and the delivery time of our products in the off-season is about 30 to 45 days.

Q:What packing are the goods to be sent abroad?
A:The delivery time of goods abroad is long, and the wooden frame will be used to package to ensure the quality of the product is intact.

Q:What are the shipping methods supported by the goods?
A:We choose according to the needs of customers, FOB,CIF,CFR and so on.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now