Transmission Type: | Flexible |
---|---|
Rhythm: | Flow Production Line |
Automatic Production Line: | Comprehensive |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
The equipment is composed of a double-station grinding mechanism, a double-channel positive and negative conveying mechanism, and a turning mechanism. The import and export are at one end of the machine, and a person is fed and received.
During operation, the workpiece is placed on the conveyor belt transported forward manually. After the front of the workpiece is polished through the grinding area, the magnetic side of the end of the product is turned over and imported into the reverse conveyor belt. After the reverse side of the product is polished through the grinding area, it is transported to the entrance and exit position, and the workpiece is collected manually.
Scope of application | Metal stamping, machining, grinding machine processing, powder metallurgy and other workpiece double-sided polishing burr, fillet, rust removal, oxidation skin, cleaning and drying, rust prevention, etc,Finish the polishing and deburring process of both sides of parts in one time |
Grinding mode | Strong magnetic adsorption, wet grinding, rotary through machining; |
Control system | Man-machine interface control, one key to start the whole equipment operation; |
Total power | 7.5-11KW |
Specification and size | The total length is about 3-4.5M* Width 1.2M* height 2.2M |
Q:What is the price of the equipment?
A:According to customer product process needs, machine configuration depends,High equipment configuration, preferential prices, much cheaper than Europe and the United States
Q:What is the delivery date of the goods?
A:The delivery time of our products in the peak season is 60 days, and the delivery time of our products in the off-season is about 30 to 45 days.A:We choose according to the needs of customers, FOB,CIF,CFR and so on.
Suppliers with verified business licenses